|
Installed capacity 38 MW -the first stage of cascade of Shaori-Tkibuli HPPs is annual regulation hydro power plant Shaori HPP. The plant is built on the river Shaori. Its reservoir is made of the dam built next to territory of the village Khorga, in Shaori hollow. The power knot is situated in the city Tkibuli. The plant was put into exploitation in 1955. |