Unnamed Business

(Immersive view)
  • JSC ENERGO-PRO Georgia Sandro Euli street #1, 0186, Tbilisi, Georgia

  • Link: http://www.energo-pro.ge
  • Phone: +995 32 319 800
Installed capacity 113 MW - located on the territory near Tsageri. The HPP is built on the water flow made by redirecting the river Tskhenistskali into the river Lajanuri and the volume of its water reservoir is 25 mln m3. The underground HPP has decade regulation design. Lajanuri HPP was put into exploitation? in 1960.
View on map

Spillway Dam (Lajanuri, Georgia)


Adobe Flash Player 9 (or newer) needed

...click here to download...